1

High-Efficiency 400 kW Chiller Installation Delivers £50,000 Yearly Energy Savings and 200 Metric Tonnes CO₂ Reduction

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely conclusion of the project. Designed to advance ESG targets, the installation enhances cooling reliability while minimising overall energy usage and CO₂ emissions. https://socialupme.com/story6330872/high-efficiency-400-kw-chiller-installation-achieves-50k-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story