Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system built to comply with demanding hygiene and production criteria. The contract covered the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://bookmarkstumble.com/story22607476/penmann-ltd-completes-comprehensive-hvac-refurbishment-for-the-liverpool-based-nutricia-facility-supporting-fsi-phase-1-2