For most deep pour projects, you need to block off the substrate perimeter with A short lived dam, with railings, or with lifted edges, considering the fact that this epoxy can move right from the surface area and on to the Room beneath it because of its decrease viscosity. This https://apollobookmarks.com/story19211928/the-smart-trick-of-concrete-coating-that-no-one-is-discussing