The 25mm thick hefty metal tube is driven Along with the finish closed by a steel shoe. On achieving the expected driving resistance, a full duration cage is lowered in on the tube and crammed with substantial slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://tysoneelmo.blog2news.com/33183483/not-known-details-about-cast-in-situ-piles-in-bangladesh