In this process, a circular hole is excavated up into the depth at which the soil will stand unsupported (about 0.5m for delicate clay and 2m for stiff clay). Vertical boards referred to as laggings, are then established in place around the excavated face and therefore are held tightly towards https://seingalq520irz8.iyublog.com/profile